The Looming Sediment Problem at Lake Powell and Glen Canyon National Recreation Area

November 10, 2024
by John S. Weisheit

Under construction

CONSIDERATIONS ABOUT CONTROLLING THE COLORADO RIVER WITH MASSIVE INFRASTRUCTURE

Hoover Dam and Glen Canyon Dam

  • The primary purposes of Hoover Dam and Glen Canyon Dam is to contain large snow melts of 4 to 5 months, at a total volume of 30 million acre-feet, and random extraordinary precipitation events of 4 to 6 million acre-feet.
  • The secondary and tertiary purposes are to store water, and to store entrained sediment & organic detritus.
  • The fourth and fifth priorities are to generate electricity and provide opportunities for human recreation.
  • Hoover Dam is designed to release a total of 518,000 cubic feet per second. The maximum flood release is confined to one-month of spillway operations, and the spillways will require subsequent repairs.
  • Downstream of Hoover Dam, regulatory agencies allowed the historic floodplain of the Colorado River to be occupied at the river level of 28,000 cubic feet per second.
  • The levee below Imperial Dam has a design capacity at 80,000 cubic feet per second. The purpose of the levee is to assure the flood flow will not be captured by a structural depression called the Salton Sink (below sea level).
  • At Glen Canyon Dam there are eight 15-foot-diameter steel penstocks for delivering water to the turbines in the powerplant. The centerline of the penstock intake is at elevation 3470 which is about 45 feet above estimated silt elevation after 150 years of reservoir operation. Minimum water surface for power operation is elevation 3490.
  • The river outlets at Glen Canyon Dam have a capacity of 15,000 cfs with the reservoir water surface at elevation 3,490 feet. The centerline of the intake is at elevation 3374 which is about 30 feet above the estimated 100-year silt level in the reservoir.
  • The original spillway specifications as of 1961.
  • The spillway specifications as of 1984, after the spillway were repaired and modified with increased air slot capacity.
  • The spillways at Glen Canyon Dam, in 1983, were compromised after six days of operations, and at 20% of capacity.
  • The modified air slots for the spillway tunnels at Glen Canyon Dam...
  • REFERENCES - Hoover Dam specifications by Elwood Mead; Glen Canyon Dam specifications by Ernest Schultz.

 

______________________________________________________________

NEWS FROM THE DESERET NEWS

VIDEOS FROM DESERET NEWS

VIDEOS FROM ST. GEORGE NEWS

BOOKS FROM TORREY HOUSE PRESS

FUTURE RESERVOIR MANAGEMENT

REPORTS FROM RETURNING RAPIDS PROJECT

 


Discussion:   Talk about this article...



Topics

Administrative
Dam Operations
History
Legal
Management
News
Pollution
Public Notices
Recreation
Science



Sponsors

Back of Beyond Books
Barbara Anne Morra Memorial
Canyon Country Rising Tide
Canyonlands Watershed Council
Celebrating the Grand Canyon
Center for Biological Diversity
Colorado River Connected
Colorado Riverkeeper
Corey Allen Hale Memorial
CounterPunch
Dive Into Democracy
EcoMoab
Five Quail Books
Frank West Bering, Jr. Memorial
Friends of the Earth
Going Solar
Great Basin Water Network
Green River Action Network
Holiday River Expeditions
Las Vegas Water Defender
Living Rivers
New Belgium Brewing Company
O.A.R.S White Water Rafting
Patagonia
Paul Henderson Memorial
Peaceful Uprising
People's Energy Movement
Resource Renewal Institute
Returning Rapids Project
Rig To Flip
River Runners for Wilderness
Save The Colorado
Serena Supplee Gallery
Sheep Mountain Alliance
Steaming Bean Coffee Company
Tom Till Photography
Upper Colorado River Watershed Group
Upper Green River Network
Uranium Watch
Utah Rivers Council
Utah Tar Sands Resistance
Wabi Sabi
Waterkeeper Alliance


On The Colorado All content © 2024 On The Colorado Contact UsFollow us on Twitter